Krispy Kreme - Seattle

General Contractor:  Wilcox Construction

Estimated cost $325,000

Down spout lines, footing drains, cap break, grease interceptor, storm system, storm filter, water line, prep for sidewalks, curb excavation and grade parking area for asphalt sub grade, street improvements along 1st Ave, Holgate, and Occidental.


USCG D/B Shore Ops. Bldg. - Seattle  

General Contractor:  Howard S. Wright Const.

Estimated cost $500,000

Demo and regrade existing parking area, on site storm, storm filter vault, footing excavation slab prep, sidewalk prep, grade for asphalt, tie in sewer, FDC line, PIV valve, fire line, water main extension, install hydrants, and 3 street tie-ins.    


Winterpond - Pierce County

Project Owners:  Gene & Sue Hahto

Estimated Cost $1,100,000

30 - lot housing development in Pierce County.  Erosion control, 35,000CY pond excavation, 5000LF of  storm, asphalt prep for road, county road upgrades, electrical trenching,  water main and stubs.


Enterprise Rent-A-Car - Sea Tac

General Contractor:  Wilcox Const.

Estimated Cost $750,000

Erosion control, excavate for 154 x 19 x 14 retention vault, export 17,000 CY of unsuitable material, import 15,000 tons of structural backfill, tie-in on Pacific Hwy., water, sewer, storm, building excavation, slab prep, sidewalk prep, curb prep, and retaining walls.



Pacific Peninsula Plaza - Olympia 

General Contractor:  SD Deacon

Estimated Cost $185,000

Street tie in—sewer, water and storm, on site water storage—190LF of 75” x 112” tank, roof drain infiltration system, slab prep, sidewalk prep, grade for asphalt, tie in sewer, FDC line, PIV valve, fire line, footing excavation, and footing drains.


Bowen Pipe Work 1

 Nissan of the Eastside - Bellevue 

General Contractor:  SD Deacon

Estimated Cost $350,000

300 LF 54” storm retention, 4 storm vaults, FDC, fire line, 19’ deep sewer tie-in, building excavation.